NEWS CENTER
CHANGCHUN MEICHEN MACHINERY CO., LTD
WEST ZHONGYAN ROAD,ECONOMIC DEVELOPMENT ZONE, LUYUAN DISTRICT,CHANGCHUN, CHINA
The general manager of the company: Qi total
Phone: 13804302509
Dry concentrated Division: Sun Dechen
Tel: 0431-81087887
Phone: 18686624851
Solid liquid separation
Division: Wang Li
Tel: 0431-81087889
Phone: 13304300251

Briefly describe the installation and operation of the rotary drum vacuum filter
- Categories:Company News
- Author:
- Origin:
- Time of issue:2020-10-29 09:18
- Views:
(Summary description)Level the rack, rack and frame at the same time, put the rack in place, and connect the racks according to the regulations in the manual. After correcting the level, the frame should be firmly fixed.
Briefly describe the installation and operation of the rotary drum vacuum filter
(Summary description)Level the rack, rack and frame at the same time, put the rack in place, and connect the racks according to the regulations in the manual. After correcting the level, the frame should be firmly fixed.
- Categories:Company News
- Author:
- Origin:
- Time of issue:2020-10-29 09:18
- Views:
(1) Level the rack, rack and frame at the same time, put the rack in place, and connect the racks according to the regulations in the manual. After correcting the level, the frame should be firmly fixed.
(2) Adhesive tape roller, fix the roller supporting the tape on the frame, after leveling, spread the rubber filter belt on the roller. Lift the driving roller and the driven roller to the middle, that is, the middle of the rubber filter, and then move them to the two ends respectively, and install the bracket and bearing seat.
(3) Assemble and put the vacuum box components in place, connect the vacuum box in sequence, and install it with the small idler, the lifting mechanism, and the winch frame to the frame together, and fix the frame and the frame with bolts .
(4) Install feeding device, washing device, small roller, filter cloth tension device, filter cloth deviation adjustment device, scraper device.
(5) Install the connecting hose, and the connection must be tight and no air leakage.
(6) Drive device, put the drive device frame in place, install the reducer and coupling, and ensure the coaxiality of the drive roller and the motor shaft.
(7) The gas system, gas control and deviation adjustment cylinder are connected with high pressure hoses.
(8) Piping system, connecting feed, washing, cleaning and vacuum system piping.
(9) Electric control system, connecting electric control cabinet and drive motor, gas control cabinet, joints and pipeline valves.
(10) Filter cloth, place the filter cloth gravity roller at the loosest position of the filter cloth, find the arrow of the direction of movement of the filter cloth, and then pass the filter cloth through the feeding box, washing box, driving roller, filter cloth gravity and deviation adjustment Roller, roller, etc., flatten it, butt the two zippers of the filter cloth, and thread it into the steel wire. Check the flushing pipeline before installing the filter cloth to ensure that the water from all nozzles can flush the filter cloth.
Scan the QR code to read on your phone
Webpage Copyright:CHANGCHUN MEICHEN MACHINERY CO., LTD JI ICP 14002198 Powered by : 300.cn